A
atkins_1
Do I need to bond the incoming water and gas to my garage conversion ? They are fed by plastic supply pipes. But then all copper through the 40 square foot building containing small bathroom. Utility room and office. The electric feed is 16mm 3 core armoured to an mk rcd 5 way board.