S
spurs1980
Morning guys
Currently on a 4 bed rewire,on outside wall I have 2 cavity boxes one housing the gas meter and one housing the head and meter, the old consumer unit was on wall directly behind this box but is now being moved
My question is that on this TNS supply can I bond the gas straight to the MET as it is right next door and then bond the water in the new board or have both got to be at either the MET or at the new consumer unit
Thanks
Currently on a 4 bed rewire,on outside wall I have 2 cavity boxes one housing the gas meter and one housing the head and meter, the old consumer unit was on wall directly behind this box but is now being moved
My question is that on this TNS supply can I bond the gas straight to the MET as it is right next door and then bond the water in the new board or have both got to be at either the MET or at the new consumer unit
Thanks