Hi all. Thanks for the replies. Should have added, the concrete slab is 3.6m above ffl. The cables are run around the edge of rooms, stabbing out to light fittings.
I’ve tried explaining the regs to the BI, but to no avail. Even the client thinks he’s just being bloody minded.
Unfortunately, I think we are all going to have a lot more of this and as with all regulation changes, our costs are going to increase.
On a bright note, it’s a one off job south of London, 50 miles from home. So I won’t have to deal with him again
Thanks again for the input
I’ve tried explaining the regs to the BI, but to no avail. Even the client thinks he’s just being bloody minded.
Unfortunately, I think we are all going to have a lot more of this and as with all regulation changes, our costs are going to increase.
On a bright note, it’s a one off job south of London, 50 miles from home. So I won’t have to deal with him again
Thanks again for the input