if the builder is going to build 50mm stud off the wall do i need to pipe down from basket to level of sockets, say finishing on end box with no lid.. comming out to each socket then

or could i just T&e clip to wall at back of medal stud?
 
Hey up mate,

Cant fully visualise from your description what the builder is actually doing, can you put more detail in.

Cheers............Howard
 
if a builder is going to do that, you need to use reinforced , double strength steel conduit. LOL.
 
You could do either...

It's usually done without conduit...but would be a better job in it...
 
sorry howard, he is building a metal partition stud 50mm off the wall so my basket and pipe will be behind stud..

im doing all my sockets as 4mm radials which is ideal and all skt circuits are relativly close im only putting six dobles max on a circuit most have 4.. some say over kill im trying to fill 3 ph board lol
 
As long as its 50mm or more then no conduit required, although it still is good practice to install it anyway.
 