I
i=p/u
if the builder is going to build 50mm stud off the wall do i need to pipe down from basket to level of sockets, say finishing on end box with no lid.. comming out to each socket then
or could i just T&e clip to wall at back of medal stud?
or could i just T&e clip to wall at back of medal stud?