R
RyanCheetham
Morning guys, today i have to run in a new supply for an induction hob. It will be ran externally in conduit for around 5m then it will come into the kitchen and i am going to clip direct to the wall behind the units, the kitchen is U shape and the hob is on the opposite side of the room to the cables point of entry. My original plan was to chase the screed and go straight across to the hob, however going around the wall is far easier. My question is if i had of chased the floor, would plastic conduit of been satisfactory protection before making good or would it need to be more robust? The floor chase would of been about 2.8m long