That's a big job to be taken on. If its the case good luck to you but if your asking a forum about the design stage then I think you have got your work cut out.
 
Nic have you ventured into doing this work? If so have you come up with?

Sent from my GT-I9300 using Tapatalk 2

when the client sees the price of putting 2 DB's on ever floor and 1 CU per room and 4mm radials i think the project ( or contractor ) will be binned ;-)
 
Am I missing something here? The OP wasn't Nic. Not where I'm looking anyway.

Daz
 
Most the hotels i've tested usually have 1 DB supplying 2 rooms, located in the riser between the 2 rooms. Usually fed by a 10 or 16mm T+E, protected by a 32 or 40A MCB back at the sub board on the same floor. Never seen a sub board supplied by a 16mm T+E. They're usually a 25mm SWA at least. Good luck!
 
Am I missing something here? The OP wasn't Nic. Not where I'm looking anyway.

Daz

Mr. Owen AKA Spazz is like Walter Mitty. A figment of his own imagination.

Not that I’m suspicious but I think someone is trying (unsuccessfully) to distance himself from his more bizarre posts.
 