and back to the OP , you say 230 mtrs?

pfft , forget it.

pulling that much swa of that size will require....

a. a team of men & a sh*t load of equipment

b. at least 3 through joints to piece individual section together cos you aint gonna get 230 mtrs of 120mm pulled in in 1 piece - trust me.

it it be easier to get a dno supply from an overhead pole if theres one knocking about.

2 X 350M of 120sqmm direct lay into trench off cable drum trailer, piece of cake :shades_smile:
 
wait till tidyboiler sees them. there won't be owt on them drums.
 