and back to the OP , you say 230 mtrs?
pfft , forget it.
pulling that much swa of that size will require....
a. a team of men & a sh*t load of equipment
b. at least 3 through joints to piece individual section together cos you aint gonna get 230 mtrs of 120mm pulled in in 1 piece - trust me.
it it be easier to get a dno supply from an overhead pole if theres one knocking about.
2 X 350M of 120sqmm direct lay into trench off cable drum trailer, piece of cake :shades_smile: