S
skydog1
Hi and thanks for the replies again.
i was going to run a 3 core armoured from the cu in the bungalow to the consumer unit in the caravan,
then bond the metalwork to the earth bar in the cu in the caravan is this not correct as theoretically it would be connected to the cu in the bungalow via the armoured cable, or should i just run a 10mm from metalwork of the caravan to the cu in the bungalow.
thanks and best wishes great forum by the way.
i was going to run a 3 core armoured from the cu in the bungalow to the consumer unit in the caravan,
then bond the metalwork to the earth bar in the cu in the caravan is this not correct as theoretically it would be connected to the cu in the bungalow via the armoured cable, or should i just run a 10mm from metalwork of the caravan to the cu in the bungalow.