I am doing a complete rewire, I'm not part P scheme registered, so having building control inspect for me.
I'm about to call them in to check my first fix, so I've chock blocked everything out for the insulation test & R1+R2 tests. I'll test it all myself & they can have the results & check them themselves if they wish.
My question is should I have used earth sheathing, it seems a waste as it's all temporary connections.