Hi folks. My house has Econ.7 therefore I have 2 consumer units. Is it possible to incorporate the heating board into the main board. I don't do any domestic stuff. I've seen dual boards and split boards but I'm cofused as to what the difference is. For example can I buy a dual board and have one side fed from the normal supply and one side fed from the econ 7 side? I have a prepay meter if that makes any difference.
 
you can do it by removing the tails feeding the second RCD form the main switch and replacing with tails from the E7 supply.
 
Well, to start with, I'm not sure, whether per paid meters can be used for E7.
You may find that when the meter was changed, the E7 was removed.
It may well be possible to incorporate both CUs into one, but unless you can fine a manufacturer who produces such an item, it will probably involve a lot of fading about and be quite expensive.
 
Well, to start with, I'm not sure, whether per paid meters can be used for E7.
You may find that when the meter was changed, the E7 was removed.

They can be set to have different tariff units for different times of day, so in theory it makes no difference. In practice, it all depends on who set the thing up and whether they could be bothered to pay attention.

What the OP needs to tell us is why he wants those circuits incorporated into the 24/7 system - if it's just to switch storage heaters on during the day then the white board could always be fed from a spare way in the main CU via a bit of 16mm.
 
I always thought that with E7 and E10, that there were either two meters, or two outputs from one meter.
One for normal tariff, and the other for the E tariff.
Do some suppliers allow for the whole installation to be switched to the E tariff?
If so, is there any point in having separate CUs?
 
Your electricity bill should detail whether your dual tariff or not. !

If the OP is wanting to connect might storage heaters to the "day" circuits then one would have to ask why ?
As there would be no advantage.
Better to just buy a free standing convector heater ?
 
you can incorperate both in one dual board as tel has said one thing i would do is an isolator for all circuits 24 and 7 hour and the board labled too as it will then have more than one supply
 
I always thought that with E7 and E10, that there were either two meters, or two outputs from one meter.
One for normal tariff, and the other for the E tariff.
Do some suppliers allow for the whole installation to be switched to the E tariff?
If so, is there any point in having separate CUs?


Theres a few neat us that are on E7 and have just a single CU with just 1 set of tails. Entire house is metered as E7 during the E7 period
 
Theres a few neat us that are on E7 and have just a single CU with just 1 set of tails. Entire house is metered as E7 during the E7 period

Round my way, it was Eastern and LEB.
Both would only allow heating and hot water on the E tariff.
 
Wylex do a dual tarriff board with 2 100A main switches for your 2 sets of tails but this does mean that you'd have to rcbo all the circuits that needed it which could work out a bit pricey!
 
Thanks for the replies so far. The meter does indeed have two sets of tails coming from it. One set for the main board and one set for the heating board. I don't want the heaters on during the day, and I don't want the rest of the circuits on E7 at night. As the DBs are in the kitchen I want to try and get rid of one, ie the heating Db. So just to clarify I can connect one set of tails, the normal set to the left side of the board to a RCD. Then connect the E7 set to the right side of the board.
 
Thanks for the replies so far. The meter does indeed have two sets of tails coming from it. One set for the main board and one set for the heating board. I don't want the heaters on during the day, and I don't want the rest of the circuits on E7 at night. As the DBs are in the kitchen I want to try and get rid of one, ie the heating Db. So just to clarify I can connect one set of tails, the normal set to the left side of the board to a RCD. Then connect the E7 set to the right side of the board.
Best make sure that both the normal circuits and the E circuits are on the same phases.
Then you would have to remove the link between the main switch and the RCD, keep the neutrals associated with the circuits connected to the RCD side separate from the other neutrals in the board and then place a warning notice, that switching off the main switch does not isolate all the circuits in the CU.
As you would effectivly be having two main switches, for the same installation, you would have to note this as a departure on any Certification.
 
You could always think about 2 MK units with a stacking kit, would give you the benefit if you did isolate one board you know everything within that enclosure is isolated from the other DB and aesthetcally look all as one unit.
 