When testing a house, you should link the rings at the CU and go round to each AND every socket to test the continuity and polarity - failing to do so is NOT a good idea.
As for lights you need to do the same.
And yes a complicated board chage can take over a day, plus the tails and bonding.
What you should do, is visit the site the day before, draw a sketch of the layout, mark all the points and then work out which fuses control what. If you don't do this you won't know what to test - which will render your EIC worthless.
EDIT: And if you don't know where all the sockets are how will you be able to unplug everything, so that you don't blow up have their kit when you shove 500V down it??????????