Hi all

First off, Merry Christmas and all that Jazz

I am after some help to speed up the time it takes me to install downlighters.
I use fire rated 12V IP65 downlights in bathrooms. When installing with a pull cord I run the power in to a 5a 4 terminal JB. Then 2 core to pull cord for live/SL. Then run first cable from JB to first tranny
using a choc box (screwfix equivalent) and 3 terminal blocks, i loop in and out then connect the tranny and finally the tranny to the down light, then move on to repeat x number of times. All usually done in loft space.

Completed job yesterday, where I had to measure out and drill the holes, while avoiding joists ETC
also install a showerlight fan using a similar approach to above but including a 3a FCU. Also added two pull cords.
Had some issues wth the joists and the position of the fan which I had to overcome, but ended up being onsite for 8 hours with not much of a break.

Is there a quicker/easier way of doing this as it seems to be taking me for ever.

Any help you guys could offer would be greatly appreciated.

Cheers in advance
Fish
 
I tend to try and spend as little time as possible in the loft, Wire and clip what is nesseary in the loft and the bring the final connections through the hole in order to wire from below (Unless you really love being in the loft)

Personally i prefer the mains voltage lights or if i am using trannys then i tend to use the ones that allow you to loop in and out.

Are you new to the trade or just a DIY'ER. How many lights have your wired in 8 hours?? Thats a long time even if you have had to overcome the posistioning due to the location of joists.

And can i ask what the purpose of two pullcords are, I think i know the answer but would be interesting the hear what you say
 
Could you not go straight to the switch with supply and loose the JB...

Instead of screw type JB use Hager MF JB...and instead of choc blocks use wago connectors...

That will save time...
 
Quickest way, feed to the switch then onto you 240V GU10 downlighters

12v take longer to install, break down regularly, cost more to run and buy and are too much of a fire risk for my liking
 
yes Unnecassary Jbs are a nusience, I always try to avoid any joints unless they are required, totally agree with Brightspark about the wiring in this case, no need for that JB at all
 
I tend to try and spend as little time as possible in the loft, Wire and clip what is nesseary in the loft and the bring the final connections through the hole in order to wire from below (Unless you really love being in the loft)

Personally i prefer the mains voltage lights or if i am using trannys then i tend to use the ones that allow you to loop in and out.

Are you new to the trade or just a DIY'ER. How many lights have your wired in 8 hours?? Thats a long time even if you have had to overcome the posistioning due to the location of joists.

And can i ask what the purpose of two pullcords are, I think i know the answer but would be interesting the hear what you say
absolutely.....i hate that insulation stuff they use.....
 
The last loft I worked in was absolutely filled to the brim with polystyrene chips. Some clown had used them instead of proper insulation. Felt like a kiddy in a ballpool. When I got home I had them in my car, my toolbox, my pockets, bloody things.
 
The last loft I worked in was absolutely filled to the brim with polystyrene chips. Some clown had used them instead of proper insulation. Felt like a kiddy in a ballpool. When I got home I had them in my car, my toolbox, my pockets,.

And bum crack?...
 
Are you new to the trade or just a DIY'ER. How many lights have your wired in 8 hours?? Thats a long time even if you have had to overcome the posistioning due to the location of joists.

And can i ask what the purpose of two pullcords are, I think i know the answer but would be interesting the hear what you say

Old in the trunk, new to the trade, setting up for when the redundancies start. Completed up to 2391 ,second year with Elecsa and always learning.
Re Pull Cords, your worst suspicions I would imaging, client did not want the fan on the same circuit as the lights, electrically sound but building regs issues . . . . .
 
Quickest way, feed to the switch then onto you 240V GU10 downlighters

12v take longer to install, break down regularly, cost more to run and buy and are too much of a fire risk for my liking

Feed to the switch and wago the neutral? Do you loop in loop out of the downlighters? Seem to stuggle with 2x 1.5 t&e when I have tried before
 
Feed to the switch and wago the neutral? Do you loop in loop out of the downlighters? Seem to stuggle with 2x 1.5 t&e when I have tried before

Join the neutral, Loop in loop out of the downlights (I use 1mm anyway), plenty of room with 240v downlighters because they have a proper terminal block in an enclosure so nothing exposed like a lot of the 12v fittings :)
 
i daisy chain line enclosures on the T/E with approx. 9" of 0.75mm flex to the downlights. OK it takes some time, but i hate wiring T/E direct into the fittings.
 
I've started using Wagos in an IP rated adaptable box, single feed in then spider legs out to each 240v DL (not a fan of 12v either) in heat resistant flex.
 
Yes I am a fan of 230v spots over 12v, no transformer so 1 less thing to go wrong in the future for the client.

I fit gu10 fittings and always advise led lamps.
 
we sit and make all the fittings up with their lamps, and fit them with 6" of flex, this can all be done sitting down with a brew, for downlights this is the few occasions that i tend to loop in and out of the switch as id rather this than use a JB.

i loop the load in and out of the downlight positions in T&E, then come second fix, all i have to do is strip the T&E back into 3 lever wagos, i do the whole room and the follow round dropping the flex in to the wagos, snapping a cheap choc box over them and dropping the fittings up into the ceiling. I find this a much easier to do, it reduces the time spent on steps, and the extra cost in material is more than covered by the reduction in time spent. we recently did a nightclub with 550 downlighters and 6 of us managed to do all of the lights in 2 days give or take.
 