I usually wire T&E between each Line or Hager downlight junction box (not standard JBs). From each JB to the downlight in two-core .75mm heat resistant flex. That way you can maintain the CPC throughout the circuit and you're not trying to cram two cables into each downlight.
Just to add variety to this thread, I am quite happy to wire T+E direct into downlights depending on the lamp used, make of downlight, space around the downlight, and what the bit of paper in the box says.
I wouldn't normally do it with GU10s, simply because regardless of what lamp is in it at the time of installation, it is quite likely that a 50w lamp may be fitted in the future. I've seen scorched T&E on more than one occasion! It depends on how close the termination is made to the lamp I suppose.
hmm never thought about this before, i suppose i do what i find easiest at the time i usually use fire rated gu 10 s and twin and earth. if a large installation would prob use flex click thingies but only for easy installation.
Even on a Domestic job with down lighters I would terminate the t&e in a junction box and flex to the fitting. It only costs an extra £1 and 5 minutes time. How can 2 t&e cables be terminated neatly in the downlight connection box. And with many cheaper downlights not having an earth connection how are these terminated?