On a site we look after there has been a lot of work done to expand areas. One of the jobs done by contractors is to extend the existing three phase bus bar of an overhead crane and fit an additional crane so there are now two running off the one busbar system. They installed a new supply cable at the far end of the new busbar so the run is now fed from two different supplies, one each end. They did this because the volt drop would have been too much had they just extended the existing busbar with the original feed.
I appreciate it is acceptable to have things fed from two supplies but I began to have concerns when they did it without informing the end users that the busbar now needs to be isolated from both supplies. When I say they did not inform anyone I mean they didn't identify it in their proposal, I honestly think they were not intending to join the two busbars, I don't think they had allowed for the cranes to be able to run the entire length of the busbars and had just thought they would both stick to their own sections. All their proposal identifies is the supply to the new busbar as a seemingly stand alone item. Being an afterthought is reinforced by the lack of signage to identify dual supplies either at the isolators or along the bus bars, everything has been handed over now so should all be in place.
I will be going through the regs but initially, would welcome thoughts:
Whilst the origin of the supplies is derived from the same HV transformer, the routes to the crane supplies are diverse in that part of the extension works was to install a new MCCB panel at the transformer where one switch feeds the old LV panel which in turn feeds the old crane supply, then a new switch serves a new LV panel in a different part of the building which feeds the new crane supply. I don't know the details of difference in volt drop between the two supplies or if there is any equipment biased to either supply that could affect the sine wave. I am pretty sure dual supplies designed to work together need to be from the same source but unsure if this is the transformer or DB.
I will have to check the size of supply cables, protective devices etc as I think these have to be the same but not 100% sure until I consult the regs.
It just seems like I am missing something that I cant put my finger on and would welcome any advice
I appreciate it is acceptable to have things fed from two supplies but I began to have concerns when they did it without informing the end users that the busbar now needs to be isolated from both supplies. When I say they did not inform anyone I mean they didn't identify it in their proposal, I honestly think they were not intending to join the two busbars, I don't think they had allowed for the cranes to be able to run the entire length of the busbars and had just thought they would both stick to their own sections. All their proposal identifies is the supply to the new busbar as a seemingly stand alone item. Being an afterthought is reinforced by the lack of signage to identify dual supplies either at the isolators or along the bus bars, everything has been handed over now so should all be in place.
I will be going through the regs but initially, would welcome thoughts:
Whilst the origin of the supplies is derived from the same HV transformer, the routes to the crane supplies are diverse in that part of the extension works was to install a new MCCB panel at the transformer where one switch feeds the old LV panel which in turn feeds the old crane supply, then a new switch serves a new LV panel in a different part of the building which feeds the new crane supply. I don't know the details of difference in volt drop between the two supplies or if there is any equipment biased to either supply that could affect the sine wave. I am pretty sure dual supplies designed to work together need to be from the same source but unsure if this is the transformer or DB.
I will have to check the size of supply cables, protective devices etc as I think these have to be the same but not 100% sure until I consult the regs.
It just seems like I am missing something that I cant put my finger on and would welcome any advice