Congratulations on getting an apology from your energy supplier for sending out this email containing what they know to be a blatant lie. I've received a similar email many times from each of my three energy suppliers, and, in spite of complaining by return, have yet to receive any reply that could be called an apology. It's just part of their aggressive campaigns to meet government targets for 'smart' meter installations.
The company inspecting the service head will be nothing to do with the company that bills you for your electricity usage and as long as there is nothing physically wrong with your existing meter to suggest it is dangerous or faulty, if the service head is replaced, it will be connected to your existing meter.
You cannot be forced to change from a certified, serviceable meter against your will.
Congratulations on getting an apology from your energy supplier for sending out this email containing what they know to be a blatant lie. I've received a similar email many times from each of my three energy suppliers, and, in spite of complaining by return, have yet to receive any reply that could be called an apology. It's just part of their aggressive campaigns to meet government targets for 'smart' meter installations.
The company inspecting the service head will be nothing to do with the company that bills you for your electricity usage and as long as there is nothing physically wrong with your existing meter to suggest it is dangerous or faulty, if the service head is replaced, it will be connected to your existing meter.
You cannot be forced to change from a certified, serviceable meter against your will.
Mine is worded as 'recommended date of next inspection April 2026'The 'engineer' inspecting and possibly changing the service head has no interest in the meter whatsoever, other than to check it's in a safe condition.
I've never seen a service head with an 'inspect date' on it, but that's probably because electricity came quite late to my area and we just don't have ancient ones around here. It probably should be read as 'inspect BY', and that's what they're doing.
Why the need to change the fuse already if the next inspection date is set to April 2026 (clearly suggesting the fuse is in good condition until then).
Sounds like the teleswitch has a built in fallback program, so it's carried on giving you 6-7 hours on night rate - but it's clock has drifted.The RTS switch off apparently occurred on 30th June 2026. Since then I have not seen only one register increasing, I have seen the opposite. Both day and night registers are increasing but at an almost 50/50 rate. My usage was roughly 80/20 day/night. When night was about 12:00-07:00 and day was 07:00-12:00 I am now seeing night 15:00-21:00 and day 21:00-15:00.
It it a digital/electronic meter ?Although, there are times were both registers increase at a crossover point. Anyone else experiencing this change?
It's a digital meter. I tracked it over 4 days as best I could to see where the switch was happening. The trigger was that my latest month was basically a 50/50 share which isn't usual. As I said though, the total usage is 'normal'. It's not a bother at this point, it was just not what I expected when the RTS switched off.Sounds like the teleswitch has a built in fallback program, so it's carried on giving you 6-7 hours on night rate - but it's clock has drifted.
It it a digital/electronic meter ?
I'd hazard a guess that internally it's only updating the displays at intervals. So at switchover, it switches registers, but then updates both displays a short time later.