M
MrTrance
Hi all, local resturant/golf course owner wants me to install an energy monitor for the whole building.
3 phase board with only 2 phase into build (2 phases linked on board)...
I've put a few in for single phase, straight forward, but is there anything i could do for this 2 phase without for having 2 systems (one for each phase).
Reason he wants this is because one bill was nearly double a previous bill with roughly the same electricity usage (according to him)
Thanks guys!!
3 phase board with only 2 phase into build (2 phases linked on board)...
I've put a few in for single phase, straight forward, but is there anything i could do for this 2 phase without for having 2 systems (one for each phase).
Reason he wants this is because one bill was nearly double a previous bill with roughly the same electricity usage (according to him)
Thanks guys!!