Hi all. Just a quickly. I've had a charge point fitted and was told my bonding is small to gas and no existing to water. The engineer made a call to his office and informed me that the install can still go ahead but the charge point will be set to out of service until I send photos of the rectification works. I used to be in the trade and this dont seem right. Should he have installed but not made final connection then return to connect and inspect bonds etc. Thanks in advance.