B BES Sep 8, 2013 #16 If meter is external and there are multiple entry points or if pipe entering the build is not assessalbe then bond in meter box. Done this loads of times perfectly acceptable.
If meter is external and there are multiple entry points or if pipe entering the build is not assessalbe then bond in meter box. Done this loads of times perfectly acceptable.
7029 dave ~ Mentor Arms Sep 8, 2013 #17 Bond on consumers side of any service, water/gas before first joint.