Not my area but AFIK the HV ring main is designed as a loop with switch points at each transformer, etc, but normally it has one point left open to reduce fault currents if something goes wrong.
For maintenance, etc, you can close it if needed and open another point, or open two and earth the segment between them, etc.
For maintenance, etc, you can close it if needed and open another point, or open two and earth the segment between them, etc.