Hi all, I have been a member for a while now and have been reading the forum with great interest but now i feel it is time to break my silence.
I installed three 400w low bay metal halide fittings today in a very old farm shed and only one fitting will ignite if connected. if i connect up two fittings and operate the switch then they just flicker for about 20 seconds and then go out. same happens when i connect up all three.
i had to leave it with one fitting plugged in as it was getting late and i was running out of ideas, the mcb never tripped and i belled out all of my work and found no faults
any ideas would be very great full as i am really stuck here
I installed three 400w low bay metal halide fittings today in a very old farm shed and only one fitting will ignite if connected. if i connect up two fittings and operate the switch then they just flicker for about 20 seconds and then go out. same happens when i connect up all three.
- Henley blocks into existing tails to a small 5 way board fitted with a 100a main switch
- metal 20mm conduit from board to the light switch position and the position of the lights
- 2.5mm singles
- 1 gang 1 way 10a light switch
- 10A mcb
- lights wired into kilks plugs that attach to the through boxes
i had to leave it with one fitting plugged in as it was getting late and i was running out of ideas, the mcb never tripped and i belled out all of my work and found no faults
any ideas would be very great full as i am really stuck here