used them a couple of times. much prefer the line "eggs" with M/F connectors. far quicker, less fiddly, and more versatile.
 
Oh god I hate paperwork/pricing. Been sat on my office (my bed) for hours. Just got up and feel 2foot shorter.
got the materials down :) just got to guesstimate cable now and add it on. Materials nearly at 2grand without lights or cable and thats at cost.
 
suggest 300m 2.5mm, 400m 1.0mm ( or 1.5mm ) and 100m 3 core/E. then guess the run lengths for 6mm ( or 10mm ).
 
As they say price materials and labour and compare with your price per point.. I'd prefer materials +20% then labour on top . It's hard I say without actually seeing it but we all guessing and working like f*** if we feel we've under estimated .. I'm sure you said you have nice smile so someone might help ya from here...
 
Just done a 7 bedder and that was £15000 approx. to start and ended up at £320000 approx. with down lights and outside lights etc so don't underestimate the labour side of things as will take an age to do believe me
 
Just done a 7 bedder and that was £15000 approx. to start and ended up at £320000 approx. with down lights and outside lights etc so don't underestimate the labour side of things as will take an age to do believe me

wow!!! This is 6bedder and didn't say but there is a garage 25m away that has a submain to it, sockets lights etc.
 
suggest 300m 2.5mm, 400m 1.0mm ( or 1.5mm ) and 100m 3 core/E. then guess the run lengths for 6mm ( or 10mm ).

I've done 600m 2.5mm, 500mm 1.5mm and 150m 3core. Did the cooker 10mm and rough measured that at about 15m. Just going to have to go with it!!
 
As they say price materials and labour and compare with your price per point.. I'd prefer materials +20% then labour on top . It's hard I say without actually seeing it but we all guessing and working like f*** if we feel we've under estimated .. I'm sure you said you have nice smile so someone might help ya from here...

I haven't seen it either. Should have gone visit first. Job starts building next week need quote in ASAP. Have another job to price for in London. That's going to be done off drawings.

As long as I don't make a loss ill be happy.

I do have a good smile :)
 
I haven't seen it either. Should have gone visit first. Job starts building next week need quote in ASAP. Have another job to price for in London. That's going to be done off drawings.

As long as I don't make a loss ill be happy.

that 7 bed mansion on the drawings looks like a proper big job. One month on the site or more. You dont wanna do it for free...
Add some moneys to employ some helping hands, pulling cables in 3 floor property on your own can be a tough business.
 
that 7 bed mansion on the drawings looks like a proper big job. One month on the site or more. You dont wanna do it for free...
Add some moneys to employ some helping hands, pulling cables in 3 floor property on your own can be a tough business.

This is my first job I will be doing with my new employee :)

Doing a 4 bedder on my own right now. That killed me a bit with the heat! If I need another helper think I could persuade my other half to help for a day or two :)
 
Im thinking I will do the separate labour and materials system, then compare it to the per point method. Reconfiguring the lighting points. Im not going to price for any light fittings. Theres LED downlights, 'decorative pendants', gable/soffit lights and external/internal wall lights. Thats all personal preference. :)

I personally would include a Provisional Sum for the light fitting subject to final aproval but keep it seperate from your quote. If there is one thing clients hate, its getting caught out with their budged just because they haven't read the quote properly.
 
Last edited by a moderator:
Ok sounds like ive got loads left to do lol!!

Thought I was ready for typing up....just had another quick look over and added garage stuff...havent actually thought of back boxes!

How do people do this for a living!!!
 
Keep at it, you are nearly there, think of all the money you will make from this (if you get the price right!!:uhoh2:) and remember to add a fudge factor for the other things you have forgotten, but keep it reasonable.
 