Discuss Help regarding 2365/5357 in the Electrician Courses : Electrical Quals area at ElectriciansForums.net
Why 8 CUs?Just some advice really guys, doing my 2365 hotel plan , just some advice on whether I'm on the right path or completely going southView attachment 63669
Spec would be my guessWhy 8 CUs?
It states itWhy 8 CUs?
Cheers mate , appreciated.you need to show on drawing for question C , switched socket outlets for a kettle, TV phone charger / laptop in each room (use OSG to put minimum number of socket outlets per room depending on size, you also need to show FCU for 700W heating/cooling and FCU for bathroom towell rail.
For question D show position of DB in each room and each of the above circuits coming from this db
label each circuit (for question e) i.e R1R for room 1 ring R1H for room 1 heating R1 TR for room 1 towel rail, the R2R for roomn2 and so on.
include a legend showing symbols used
Bad design then one large DB for the floor?Spec would be my guess
My guess is OP is going down a HMO route, each roohas it's own DB giving local resettable control over circuits, probably fed from 1 DB per floor, whith each floor DB going back to a central DB for the hotel.Bad design then one large DB for the floor?
'
Bad design then one large DB for the floor?
'
My guess is OP is going down a HMO route, each roohas it's own DB giving local resettable control over circuits, probably fed from 1 DB per floor, whith each floor DB going back to a central DB for the hotel.
D Show, on either electronic or hard copies of the drawing, how each circuit in the new hotelWhy 8 CUs?
Reply to Help regarding 2365/5357 in the Electrician Courses : Electrical Quals area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.