high level 95mm2 SWA run

a dont get the guys on here "walk away" "walk away" why? because its a tough job and the cable size is over 2.5 get stuck in , tell the guy ur not happy and its better to cleat it the whole run as said in above posts cable jacks and rollers scissor lift and 4 men, job done aye its a nightmare but the hard jobs are what make you a better spark .

Get real! Four crippled or dead sparks is more like.
 
Think about the logistics for a second.
You need one man on the drum, to stop it coming off the jacks.
one man to guide it on the tray, and to pull it from the jacks.
At least one man per bend, and one every 10-20 m at least. Just lifting the cable up to the tray will be hard enough. Get the boss some gloves, and boots, and get him to help. He won't ask the same of you again!
 
Think about the logistics for a second.
You need one man on the drum, to stop it coming off the jacks.
one man to guide it on the tray, and to pull it from the jacks.
At least one man per bend, and one every 10-20 m at least. Just lifting the cable up to the tray will be hard enough. Get the boss some gloves, and boots, and get him to help. He won't ask the same of you again!

What cable tray?? The idea here is to cleat and cable tie onto existing cables!! lol!!
 

OFFICIAL SPONSORS

OFFICIAL SPONSORS

Thread statistics

Created
e4electrical,
Last reply from
johnboy6083,
Replies
35
Views
7,450
Back
Top