Lads, cant express my thanks enough, really appreciate all your input here. I really hope i get the job, this would be a great stepping stone for me.
 
Also, i posted some time ago asking for help with writing up a contract of works before and didnt get too much feedback. So far ive been working without having one of these but i would like one as a kind of legal security should any customers decide to be prats, does anyone have a kind of template i can work from?
 
Good idea to do Ze test before disturbing anything. Then know if DNO needs to rectify any issues their side of the supply, or need to price in a rod, before you rip the house to pieces.
 
How do you attach files to a post?

Wade if you want PM me, I've got one I drafted for my previous company, probably overkill for what your doing but better to have every eventuality covered
 
How do you attach files to a post?

Wade if you want PM me, I've got one I drafted for my previous company, probably overkill for what your doing but better to have every eventuality covered

That would be fantastic buddy thanks alot
 
Right, so far all i know is this after speaking with her today and having not yet been to the property.

Very old house, full brick contsruction through out, 4 bed. i am pressuming here also then judging by the nature of the age of the property it will be fully floor boarded up and down. She wants 30 doubles and 50 down lights. Fortunately she understands the nature of the work and will be booking i9nto a little holiday cottage down the road with hubby and kids, giving me and my little team a week to complete the job. fortunately she only lives a mile down the road from me, which is great.

However, where the hell do i start to price this? i havnt discussed making good with her yet, but i shall be informing her she will need to get a plaster in, as i will be there an easy fortnight with my plastering ability!

Any help on how to build a quote for such a job would be very handy!

Sorry for being such a needy little git on this, i just value your input and broad experience.

Cheers fellas
 
I normally start to price with the new CU and then price per point after that dependant on the quality of the accessories specified. You can then see if the base CU costs will cover your testing (depending on the number of circuits you end up with to test/cert) and if not adjust accordingly.

I did post a template contract some time ago on the forum. I'll see if I can find it and post a link.
 
Well were looking at 3 large already just for the socket and lights, add another £300 for CU upgrade, after materials etc we must be looking at an easy 5k?
 
what about shower/s, outside lights, cooker point.

think somewhere between 4k and 5k is about right. cost your materials, add X number of days at £X per day and if that comes in at , say £4400, then thats your price.
 
How do you attach files to a post?
When in reply mode, select "Go Advanced" at the bottom, then the set of selectable icons at the top will change, it will include one that looks like a paper clip. Select to upload from your computer then drag into the bottom part of the split dialogue to include it in the post.
 
what about shower/s, outside lights, cooker point.

think somewhere between 4k and 5k is about right. cost your materials, add X number of days at £X per day and if that comes in at , say £4400, then thats your price.

Yea if i was to charge £150 a day and there is three of us on the job i think, then that comes in at £3150 + cost of materials i would imagine im looking at just over £4200 or so? Seems about right for my area on a 4 bed having just scowered the internet at similar jobs and pricing.
 
I can tell this is going to be a headache already.....i am Mr.**** poor organised so im expecting some grey hair in the next month.
 
£4200 is in the right ball park. don't forget though to add about 15% to your materials, and add a bit to cover contingencies, say 10%. then an extra socket or two, you can include without charging extra cost. don't forget bathroom fan.

if you're getting a plasterer in to make good, around £100.

as the property will be empty, you may find drops are in tube, so use it. saves a load of chasing.
 
Last edited:
Wade theres a post in business related section where one of the guys posted a link to his Ts&Cs he said he didn't mind people nicking them, I think they made it a sticky
 