They didn’t know eitherOutcome from the helpline?
Can’t believe it got to that point tho!
No pun intended either![]()

They didn’t know eitherOutcome from the helpline?
Can’t believe it got to that point tho!
No pun intended either![]()

That could well be used as a general description of BS7671.Are you referring to BS 7671 in general?
Just out of interest would you count switches on a lighting circuit as points or just the pendants?

I use the IET model forms so I don’t concern myself with the number of points purely because it is so subjectiveI count and record on the EIC the number of light fittings ...........
But I suppose I should count the lights and switches![]()

I suppose since they are a 'termination', as in they have connectors, they should be considered as a 'point' - if you were getting paid 'per point' and for argument's sake the circuit consisted of 10x switches and 1x pendant then you'd be doing a lot of work for your money otherwise.Just out of interest would you count switches on a lighting circuit as points or just the pendants?
I always had in the past, which is why I'd never considered the matter until now.I use the IET model forms so I don’t concern myself with the number of points purely because it is so subjective![]()
No idea not part of any scams at the moment but I do know SELECT let you use the IET model forms.I always had in the past, which is why I'd never considered the matter until now.
Do any of the other schemes ask you to record the number of points served, or just the NICEIC?


I've always been told to do it this way too. So I'd call a CCU with socket as 2 points. I'm surprised this thread seems to be so one sided in the other direction..I always count double socket as two points in schedule in number of points served. Single socket one point. Double socket two points nest'ce-pas?
So a 4 tube modular fitting is 4 points?I've always been told to do it this way too. So I'd call a CCU with socket as 2 points. I'm surprised this thread seems to be so one sided in the other direction..
No.. but I get your point.So a 4 tube modular fitting is 4 points?
I thought I stated that in the post - if not then my apologies. No, I wouldn't count functional switches or isolators as they are not for the connection of current-using equipment. (Leaving aside your point about the neon!)Just out of interest would you count switches on a lighting circuit as points or just the pendants?
Oh and by the way I honestly wasn’t insinuating that you were an a**e just in case you or anyone else thought that it’s just that I used to work with a guy who if you said black he said white so he would have counted the neons as current using equipmentI thought I stated that in the post - if not then my apologies. No, I wouldn't count functional switches or isolators as they are not for the connection of current-using equipment. (Leaving aside your point about the neon!)
he was most definitely an a**e