Pete, think you might have two people mixed up here. Newbyspark's answer above was his first attempt (and I think it's correct), it was the OP who gave an answer based on the switch being in zone 2 (which it isn't, as you say). :)

I realised that after I posted it see we all make mistakes
 
Why are tests required to be carried out in a set sequence?
 
Last edited by a moderator:
Remember you ahve aready done the test so you have no need to inform anyone, as you have already switched off and isolated the supply
It's an IV Pete, there should not have been a supply switched on to it at this point.
 