Hi!
Kitchen extension, 20m2 on existing 10m2 kitchen, the new area has 5x double sockets, plus own lighting circuit.
My builder has organized the electrics, and I wondered if the arrangement was OK. I am not a qualified electrician (although I am an electrical engineer) and am not familiar with the regs, hence the questions.
The house CU is an old Wylex-style, and so a separate unit with RCBO has been connected direct to the meter tails via Henleys.
This is connected to a 15m-ish run of SWA, along the outside eaves of the house, with separate CPC. The SWA is terminated (haven't looked at how) within an ordinary fused spur unit (which is supplying the lights), and connected directly to a ring supplying the sockets.
The RCBO is rated 20A.
1. Is it OK to connect a ring-wired set of sockets to a 20A rated circuit like this?
2. How can I tell what rating of SWA has been used? My quick VD calculations show that 2.5mm should be OK? I would really like to check what they have actually used.
3. Any other comments?
I am expecting a Part P certificate to be provided, but just wanted to check things through before I pay for the work.
Thanks.
Kitchen extension, 20m2 on existing 10m2 kitchen, the new area has 5x double sockets, plus own lighting circuit.
My builder has organized the electrics, and I wondered if the arrangement was OK. I am not a qualified electrician (although I am an electrical engineer) and am not familiar with the regs, hence the questions.
The house CU is an old Wylex-style, and so a separate unit with RCBO has been connected direct to the meter tails via Henleys.
This is connected to a 15m-ish run of SWA, along the outside eaves of the house, with separate CPC. The SWA is terminated (haven't looked at how) within an ordinary fused spur unit (which is supplying the lights), and connected directly to a ring supplying the sockets.
The RCBO is rated 20A.
1. Is it OK to connect a ring-wired set of sockets to a 20A rated circuit like this?
2. How can I tell what rating of SWA has been used? My quick VD calculations show that 2.5mm should be OK? I would really like to check what they have actually used.
3. Any other comments?
I am expecting a Part P certificate to be provided, but just wanted to check things through before I pay for the work.
Thanks.