I tested a house in Peckham, the zs came up as check fuse, so I changed fuse, after testing again I got a reading above 2000, recommended a tt system with a 100ma rcd trip as the main breaker. I then recommended a main switch with rcbo breakers, but to my surprise EDF was willing to attach an earth to the incoming mains in 17 weeks. Should I suggest that they should have the tt installed before EDF react. Dominic