I
ian
Went to survey a job for a builder earlier. The job was to wire 5 No, 4 bed luxury houses. We had a long chat about the requirements, there are 60 downlights, 36 sockets, induction hob, double over, 4 outside lights, 4 fans which require coring and all the usual stuff, smokes, TV to each room etc. Anyway, he gave me another estimate to have a look at which was for materials & labour. £1100. I nearly collapsed in a heap, when I priced the materials alone (all of which are brushed steel) it came to over £1200. What’s the world coming to? Anyway, this job is not for this kiddie.