S
sparks1234
Well, I am writing it here taking it straight from black and white and also from a phone call from the ECA a week or so ago so thats it as far as I can see, for £17 quid is it worth the risk?? not for me.
The installation work YOU do (eg sep cu) must have a single point of isolation, which would be the main switch for the CU that you have just installed.
Therefore, you would then have 2 installations in one building, with a main switch for each installation.
No need for a separate isolator.
![]()

Didnt think my question would cause a bit of an argument but thankyou to all for replying![]()



Didnt think my question would cause a bit of an argument but thankyou to all for replying![]()

Surely you would only have to put the second board on a separate continuation sheet as there is only one supply into the building correct me if I'm wrong.