I think I have bumped into a small disconnect between the two schemes.

Architect designed new-build / self-build. I install and commission ASHP and solar thermal. Client moves in a few days later. Client applies for domestic RHI a few days after that.

Solar thermal application going through OK I think.

For ASHP I applied the MCS Metering Guidance (flowchart page 39) and concluded that ASHP does not need metering because the house is not a second home and will be occupied more than 183 days a year, no backup heating etc.

But the Domestic RHI team ask the client a different question which is whether the property has already been occupied more than 183 days in the last year and as that is a negative then metering required in order to apply now.

Looking at the legislation, I think the Domestic RHI team have it right.

So my client has 2 options, add metering to apply now, or wait the 183 days and re-apply. He will do the latter, which is what most do, say the Domestic RHI team.

The MCS flowchart is not capturing the subtlety of the situation.
 
I'd read that as a glitch in the wording of the RHI legislation.

I can't see that a new-build was originally intended to fall under the 183 day rule. New-builds were originally excluded from RHI altogether and, IIRC, the self-build option was a later amendment. I think that 183 day rule (13(4)) should have been re-worded when self-builds were allowed but it was missed.

A new-build, by definition, is always going to fall outside that rule.
 
And when they apply after a 6 month wait they will need a Green Deal Assessment in addition to the valid EPC that they already have.
 
It depends on the MCS commissiong date versus first occupation date. Re-reading your op I see you said this. As long as the MCS date is before the occupation date then a GD isn't needed.

OFGEM have just published a new helpsheet on this last week - https://www.ofgem.gov.uk/publications-and-updates/helpsheet-i-have-newly-built-house.-am-i-eligible

It would be easy for someone to move in and then have a commissioning date the day after and then need a GD. I can see OFGEM getting sniffy about this if they ask for some documentary proof of that first occupation date.
 
We're also hitting an interesting challenge when people buy a 'new' home (i.e. old one , new to them) put in a new heating system straight away (esp biomass with the 3 monthly degressions) , and .. the systems need to be metered as the client hasn't occupied it for 183 days. In DECC's 2 year "rush" to get it right (i.e. the degression :) ) they've missed some of the subtleties, - DECC chose 7 years as that's the average time of ownership of a property, but then either it needs to be metered, or the occupier has to wait 6 months.

I doubt either the self build or new owner scenario where properly thought through.


"When applying, people have to confirm how many days in the past year the property was occupied. In addition each year they have to tell us how long it was occupied for. Applicants who think the property is likely to be occupied for less than 183 days in any of their seven years of payments may find it worthwhile to install meters when the system is installed."

So it clearly wasn't MEANT to apply in the buying a new house and installing a new system scenario

and from the latest (Feb 2015) guild on self/custom build:

"You will still need to comply with the scheme’s general eligibility criteria. For example, if you are a custom-builder who has occupied the property for less than 183 days, you will either need to be metered for payment or you can apply after you have occupied the property for 183 days to be eligible without needing metering."
 
Last edited:
we had this issue with one of our installs as well, had to fit a heat meter at the last minute.

daft rule, the intention was clearly targeted at holiday lets and second homes, not new builds.
 
Gordon, in your example this should be OK. The question is whether the building was occupied not if the present owner occupied it.

In any case the legislation (The Domestic Renewable Heat Incentive Scheme Regulations 2014) needs to be changed as it was poorly drafted and OFGEM are merely following it slavishly.

Plants where heat generation must be metered

13.—(1) The heat generated by the plant (“plant A”) must be metered if—

(a)plant A is not a solar thermal plant; and

(b)plant A falls within paragraph (2), (3), (4) or (5).

...

(4) Plant A falls within this paragraph where the property to which it provides heat was occupied for less than 183 days in the 12 month period ending on its RHI date.

So what is needed is for 13 (4) to be amended to read:

(4) Plant A falls within this paragraph where the property to which it provides heat was occupied for less than 183 days in the 12 month period ending on its RHI date and is not an eligible new-build property.
 
We may see the back of the need for a Green Deal assessment. Itis widely acknowledged the domestic RHI is tanking. There was a recent STA working group meeting attended by DECC where a number of observations and asks were made. Most of this was taken on board. As the GD itself can hardly be called a success, this criteria may change.

I think it unlikely that building energy performance requirements will disappear completely, but could well be modified for some technologies. (notably solar thermal as they have zero effect on hot water demand).
 

Reply to MCS/Domestic RHI disconnect in the Solar Thermal Advice Forum area at ElectriciansForums.net

Similar Threads

Hi I am a sparks from the 15th Ed, did 16, 17 and last year 18th. I am out of practice though as have been office based for 12+ years in a...
Replies
8
Views
1K
Apologies for the complexity of this question, but there’s no easy way to explain it. This is a remote Norfolk house and workshops, developed...
Replies
12
Views
2K
M
Hi, I was wondering if anyone has come across this type of situation. I have had an inquiry from a client with a converted house which is now 4...
Replies
5
Views
2K
Team - I'm after some help on a fault find that I was at this week and to work out if there's something obvious that I've forgotten, overlooked...
Replies
41
Views
4K
Hi All got call out to a domestic fault on consumer unit totally separate from the job & client mentions to me that they had Battery storage...
Replies
30
Views
12K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock