UKPN came out for a client as I suggested they have their supply upgraded to 100a.

My new tails are 25mm from the consumer side of the service double pole isolators.

What I can’t understand is that UKPN won’t upgrade the head because the tails which I cannot touch (between the bottom service isolator and service head) have not been upgraded?
This also includes the leg between meter and isolator

What they hell who changes there tails is UKPN won’t?

B47D7E02-4768-46DF-AF91-54D5373E5849.png
 
So what I've done in the past is had an engineer out and I've asked them to cut the seals so I can upgrade the tails. They've obliged and gone and sat in the van for 15 minutes while I do the work, then they come back, I always have them check tightness, re-install the fuse and re-seal.

My DNO is WPD and the engineers have always been very accommodating.
 
Hi - The jobs that do seem to go smoothly for me are when the DNO is also the energy supplier. Chap arrives, we do the necessary, job done. The Pot Noodle energy suppliers - not so much.
 
DNO round here are very nice chaps. Did a job with them today and now the van is richer to the tune of 30m of 25mm tails, about 10m of 16mm G/Y, a box full of 100A henley blocks and a dozen rolls of tape.

All for the bargain price of a bagful of sausage rolls.
 
To be honest....that's how i picture YOU

It's great being anonymous...i bet you think i look like Thor.....when really,i'm just a tiny,pickled brain,in a fish-bowl
You're a Manc, they are are all losers, pfffft The Liverpudlians are far more intelligent and fun to hang around with, this is me,

Screenshot 2019-05-14 at 16.50.47.jpg
 
Sod them lol....What they going to do.....Any way I would just deny it and wear gloves so my paw prints aren’t all over it :D I changed a rotten meter board the other day, at an art gallery I’m doing :eek:

....Although we cannot return any works of art...we give a prize,for all those,we show...

Whose gonna show their age,and flag where that's from...
 