Mac65
I have a customer who is the Building Manager of a commercial office building. There are 17 sub-let office areas, each with their own 3-phase meter. There is apparently a suspicion that some of the meters are not accurate and we've been asked to validate the readings on all 17. Not had a job of this nature before, and following some brief research it seems there are 2 practical options: wire in an additional, temporary calibrated meter, or measure using a power quality analyser or equivalent meter.
The meter option would not require anything to be disconnected as it can be clamped around the incoming supply.
The supply to each sub-let area can be isolated from the basement if the additional meter option is used.
Has anyone done this before? If so, what method would you recommend and how long should the meter be monitored for in order to get an accurate reading (i guess a min of 48 hours weekdays)?
Any advice would be much appreciated.
The meter option would not require anything to be disconnected as it can be clamped around the incoming supply.
The supply to each sub-let area can be isolated from the basement if the additional meter option is used.
Has anyone done this before? If so, what method would you recommend and how long should the meter be monitored for in order to get an accurate reading (i guess a min of 48 hours weekdays)?
Any advice would be much appreciated.