from typist to spark in 3 months. the mind boggles.
 
@7029Dave If your really upset do something about it complain to City & Guild its run by them and where the initiative came about. @telectrix - bang on really! (but wasn't a typist!)

- - - Updated - - -

I like a good wind up!!
 
just spread some scatter cushions and cuddly toys round the cU, you'll be fine.
 
Another rough as **** board change on the horizon here i reckon.

SW London its gotta be 600 quid in yer hand

Why u say that, how hard is is to change a board and make it look neat? My first board was neat as you please. It all depends on the installer's standards. I like to leave plenty of slack and dress it away for future. No one taught me to do that, it just came naturally, and WAY WAY before I had got my quals. I was doing 3 phase MCCB panel boards 3 years before I qualified. It doesn't mean anything.
 
hmm....

270nickhewer.jpg
 
Single phase board, Live Neutral and earth. Nice to make the terminals match up with the MCB's, bit of sleeving, and some notices. Not rocket science is it. I could teach a monkey to do it in half a day.

Now, testing, before and after, and determining meaningful results, well that's a slightly different story. Maybe another day? And the OP has done the testing and Inspection course. Please.
 
2391 (now 2395) is the only I&T qualification that counts. then there's fault finding, and if the CU is wired in MICC? back for an add on course, 1 day?
 
this CU change could turn into a disaster. anything could happen. you might break a nail. :wheelchair:
 
I have the 2391 and its not MICC. Im actually quite good @fault finding! Come on give me a little break:shame:

- - - Updated - - -

-No breaking nails! :wink5:
 
alright 'SHE', I've backed your horse. How about you assert yourself and back the both of us with before and after photos of the job, and also test results. Sound fair? You have to prove yourself on this forum.

And if you do, the rewards can be massive.

Think about it, and God speed.
 

OFFICIAL SPONSORS

Back
Top