ian

I seem to save all my arguments to Friday and today was just the same. I was in the wholesalers earlier getting a load of stuff for next week when my mate came in and he asked my advice on the best way to route cables form the C.U to the first floor when I said if possible use the cavity he responded by hurling a load of abuse and saying its against the regs to use the cavity. Honest to god I almost dropped my cup of free chicken soup. There we were arguing once again in CEF about the rights and wrongs of using a cavity. When I brought in the BRB and the on site guide and asked him to show me where it says we cant use a cavity he said….”well alright I am wrong, but its good practice not to”.

This got me thinking, trade associations give guidance on best practice, but who decides on what’s deemed to be good practice.

Also what other so-called “good practices” that do not form part of the regs are out there.

Examples of myths that really annoy me are when people say things like “joint boxes can no longer be used”, or “open terminals are fine as long as the voltage is 12 volts”.

Anyway, I thought it may be a good idea to compile a list of what’s “myth or fact” and things that a “good practice”, but not necessarily covered by the regs.

Ian
 
One that every builder I have ever worked with seems to gave in their head is 'you must not chase sideways ever under any circumstances'. Bloody annoying I'm sick of the prats going 'you can't do that' when I'm well within safe zones or going direct into an accessory.
 
i think theres something in the building regs regarding the non usage of cavitys, maybe wrong.
that and the fact youre not able to offer any means of cable support?
 
There may be something in the regs to stop such method and to do with humidity, debris, rodents but if protected and done correctly there are regs for such too.
 
cable support is the one i'd go for here. in brb, max. spacing of supportgs for different cable sizes. also, effect of cavity wall insulation onn cable insulation.
 
Hi guys, this thread was not about the rights and wrongs of using a cavity, but lets address some of them.

1 - inadequate support. - OSG PG 111, point 7, sheathed cables without armour in vertical runs which are inaccessible and unlikely to be disturbed, the length of run without intermediate support not exceeding 5 m for a thermosetting or thermoplastic sheathed cable. This would apply to most houses I work in.

2 - humidity, debris, rodents. These conditions apply to cables run under the floor, attics etc.
3 – Thermal insulation – OSG PG52, table 7.2. basically de rate the cable on design it on installation method 103.
4 Thermal Bridging. - Walls are full of ties etc, they also have the same effect.

Anyway, as mentioned earlier this thread was never meant to be about the rights and wrongs of using a cavity.

Ian.
 
Exactly! Come on, what have other trades or even sparks (TBH they are the worst offenders) said that are misinterpreted, incorrect or just so much arse?

A builder said to me today that I shouldn't put a switched-fuse spur for a boiler, it should be an unswitched one! I've never heard that one before, maybe I've missed something but what the heck was he on about?
 
Exactly! Come on, what have other trades or even sparks (TBH they are the worst offenders) said that are misinterpreted, incorrect or just so much arse?

A builder said to me today that I shouldn't put a switched-fuse spur for a boiler, it should be an unswitched one! I've never heard that one before, maybe I've missed something but what the heck was he on about?

was he a plumber?
 
A mate of mine (who's a gas engineer) has told me that the housing association he is working for has specked sockets for central heating boilers in the airing cupboard and not spurs
 
Exactly! Come on, what have other trades or even sparks (TBH they are the worst offenders) said that are misinterpreted, incorrect or just so much arse?

A builder said to me today that I shouldn't put a switched-fuse spur for a boiler, it should be an unswitched one! I've never heard that one before, maybe I've missed something but what the heck was he on about?

im sure it requires a means of safe isolation...! switch off pull fuse !! or boiler running pull fuse and create a SMALL ARC!!.....

what a chipmunk!
 
Bonding.....there's more utter bollox spouted by self appointed experts on this than any other electrical issue.....oh and the already mentioned exporting earth myth which seems to be an almost daily occurance on here.
 
A couple of weeks ago a chippo (bane of my life) told me I couldn't reterminate a plugtop on a work light in a factory "because of part P"; apparently it had to be reported to a grown up (eg team leader, in my case an electrical team leader) who then had to take it to the place where they issue the kit and do PAT testing, and probably fill in umpteen forms along the way.
It seems 3 years at college, experience on site and PAT testing in solicitors' offices (including changing plugtops) and I'm not even allowed to change a plug in this place.
 