B
Buzz-light-bulb
Hi all
Am I right in saying, aslong as I dont touch the existing installation in a domestic property, and just come off the meter tails with Henley block to new c.u. I can just get away with testing new install and leave the existing whatever the condition.
Am I right in saying, aslong as I dont touch the existing installation in a domestic property, and just come off the meter tails with Henley block to new c.u. I can just get away with testing new install and leave the existing whatever the condition.