Just want to check I've got his correct.... have a property with peak & off-peak DB.
The tails from both DBs peak & off-peak go into the same henley blocks.
Then looks like off-peak DB supply is run through a contractor, which I assume is controlled via time clock in the meter when cheap rate is switched on ?
Hope that makes sense !