Hey everybody, how's it going. Just brain storming a few ideas for getting power to some desks in an office that are in the middle of a room. Just seeing if anybody has any thoughts on my solution or any better ideas.
Basically 3 sets of 2 desks (possibly 3 sets of 3), in the middle of a room. Concrete floor, carpets are glued. False panelled ceiling. Issue is too many extension leads daisy chained. PAT tester would like that improved. Desks are required to be portable. Max load roughly about 720-1080w per set (2xmonitors, 2xphone chargers, 2xcomputers or laptops). Is rented the building so cant be too destructive.
I was thinking best way to do this without ripping up the floor and adding floor sockets is to use 2x 2-gang Pedestal 45 degree surface boxes side by side, stuffer gland in and out with 1.5mm flex going to a plug top and 2 the next 2 surface boxes (4 points total). 2 Gang sockets on each. 1.5 flex good for 15A, length of run about 10mtr max each if that. Fused down to 13A. Nylon coated P clips to secure To desk. Using what it is designed for should be about 5A max load, may be an extra desk on one set so closer to 8A possibly. They have been warned not to overload by using plug in heaters and larger load items.
Over than the possibility of overloading and blowing the fuse I cant really think of anything from the top of my head that may be an issue. The other office has a similar set up and has never had an issue.
Any thoughts or ideas welcome and appreciated.
Thanks
Basically 3 sets of 2 desks (possibly 3 sets of 3), in the middle of a room. Concrete floor, carpets are glued. False panelled ceiling. Issue is too many extension leads daisy chained. PAT tester would like that improved. Desks are required to be portable. Max load roughly about 720-1080w per set (2xmonitors, 2xphone chargers, 2xcomputers or laptops). Is rented the building so cant be too destructive.
I was thinking best way to do this without ripping up the floor and adding floor sockets is to use 2x 2-gang Pedestal 45 degree surface boxes side by side, stuffer gland in and out with 1.5mm flex going to a plug top and 2 the next 2 surface boxes (4 points total). 2 Gang sockets on each. 1.5 flex good for 15A, length of run about 10mtr max each if that. Fused down to 13A. Nylon coated P clips to secure To desk. Using what it is designed for should be about 5A max load, may be an extra desk on one set so closer to 8A possibly. They have been warned not to overload by using plug in heaters and larger load items.
Over than the possibility of overloading and blowing the fuse I cant really think of anything from the top of my head that may be an issue. The other office has a similar set up and has never had an issue.
Any thoughts or ideas welcome and appreciated.
Thanks