The MI3000 needs to be on LOOP, and carry out on incoming side of main switch with main earth disconnected.
The MI3000 can not perform a fall of potential but if supply is present then it is capable of testing Ra via Loop setting.
The MI3000 can not perform a fall of potential but if supply is present then it is capable of testing Ra via Loop setting.