W
wing nut
Hi all, currently first fixing a new build, 2 bed bungalow. They are installing a 6kw air source heat pump. Electricity company is insisting on installing a polyphase supply. They have already run their cable from the pole to the property ready for connection, it has 3 cores. Can anyone tell me why they are insisting on two separate supplies. The property has a dual fuel cooker, 3 rings, 2 light circuits, smokes and an immersion.