S

seanrtkelly

This might be a silly question but I'm a but baffled, if your are in a commercial building with an upstairs and downstairs, the mains is downstairs feeding all the downstairs circuits and a sub board upstairs. The sub board is feeding all the circuits upstairs. They Need extra points upstairs, but the sub board is completely full, can you take it to the main board downstairs as long as fully labelled? Both floors are occupied by the same people. Thank you in advance
 
Can you not add a small CU next to the sub board upstairs?
 
That could be a possibility, just wondered if it would still meet the requirements if took from the downstairs board
 
What are you adding the extra points for? Is it in an area where the general public may be, like a reception? If you are adding extra circuits then depending on who is using the extra points the circuit may need to be up to current standards. Are the original CU and sub board up to current standards?
 
No there both on the same meter. I'm not entirely sure why the board upstairs was even put in. But with every circuit upstairs being on this sub board it has confused me a little.
 
I wouldn't think there is any problem utilising the downstairs board, as long as a note is made of it. But as spoon says would it not be easier and cheaper to mount a second board upstairs?
It is important though to confirm that the extra load will have not have any detrimental effect on the existing, whichever board you use
 
I haven't actually seen the job yet, im just going on what little information I've been told. I believe its a doctors surgery type place, all cables in trunking, dado rails and the like. So not buried in walls. The new points are for some sort of display boards and data cab. So the public wont have access to them
 
why not add the new points into existing circuits on the sub-main. then it's just a MWC. or 2.
 

OFFICIAL SPONSORS

Back
Top