I think regarding the original point that nearly half of 100 units had failed the wallet of the client needs a bit of sympathy when deciding how to proceed. Clearly having to replace that many RCD's would be a very serious cost burden, if they were genuinely duff then there would be no option. But if a few operations rendered them fit and feisty then that may be sufficient, with an instruction to carry out the 6 monthly test of each unit verbally and in writing on the cert.
 
It would be interesting to know the kind of failures experienced by the manufacturers, dirt ingress, burnt contacts, overloading, frequent operation, internal component failures or external influence's? Who's going to be first to take one to bits and have a look? unless you have already?
 
I think regarding the original point that nearly half of 100 units had failed the wallet of the client needs a bit of sympathy when deciding how to proceed. Clearly having to replace that many RCD's would be a very serious cost burden, if they were genuinely duff then there would be no option. But if a few operations rendered them fit and feisty then that may be sufficient, with an instruction to carry out the 6 monthly test of each unit verbally and in writing on the cert.
That is going to be a stabbing pain in the wallet for sure! Though I guess the ten-grand-ish cost is probably not such a big deal compared to the other costs in running a 100 place park.

I was more shocked by that sort of failure rate!

They (SparkyNinja team for father & son) did not say any more about the details of it though (at least not in the video I saw, maybe they have another on RCDs and stuff that might have it as a tale to tell). As already mentioned if it is failure on self-test button but still tripping on fault it is not so bad as folk are still protected, but obviously they still need replacing so they can be demonstrated to work each time a client connects.

That was the other bit of missing information: are these static caravans and folk just don't ever look as they treat it as a fixed system, or berths for mobile ones? I would like to think the former as otherwise all of the folk plugging must not have ever tested (or did and ignored the faults).
 
I'd say I've had 50 odd square d rcbos out of about 500 fail this year in a chain of shops I've been testing in. The are about 10 years old and highly doubt they're been tested since they were installed. I expected better of square d however.
 
It would be interesting to know the kind of failures experienced by the manufacturers, dirt ingress, burnt contacts, overloading, frequent operation, internal component failures or external influence's? Who's going to be first to take one to bits and have a look? unless you have already?
Some years back I got called out by a landlord to a flat with a starbreaker board, two eastern Europeans had partially dismantled the split load RCD (Live!!) because it wouldn't reset. How the feck they hadn't killed themselves I'll never know.
 
I'd say I've had 50 odd square d rcbos out of about 500 fail this year in a chain of shops I've been testing in. The are about 10 years old and highly doubt they're been tested since they were installed. I expected better of square d however.
It was about 20 years ago I believe That there was re call on square D rcbos .
 
I have noticed the RCDs and RCBOs that are not operated regularly by use of the test button, appear to become coil bound, perhaps some sort of magnetic field builds up, or they just get hot and stick, apart from the ones suffering condensation damage
used to have the same problem with some communications equipment 45 odd years ago
one of us was dispatched to prod the armatures with a proddy thing made for the job, ie insulated, and with a large end that could not go into the contacts when operated by the company imbecile ( me)
one day I will tell you about the fat lady and her park home, but I have just eaten and feel frail
 