H

huntos33

As im new to self employment and domestic work having spent 20 years paye based on shop re fits, ive been to look at a empty 5 victorian bed house re wire, all chased out and made good over 3 floors with a basement, i was thinking about 2 weeks for man and mate any of you experinced re wirers think this sounds close ???
 
Maybe, if working a 7 day week and 10-12 hour days. Hard to call. Could be pendant drops or could be down lights every where. Bit like asking how long a piece of string is lol.
 
Maybe, if working a 7 day week and 10-12 hour days. Hard to call. Could be pendant drops or could be down lights every where. Bit like asking how long a piece of string is lol.

All pendant drops no down lights dont want to under sell myself but need the work
 
If its empty and just basic pendant drops i reckon 2 of you could do it in a week if u graft.
 
i'll go for the middle 7/8 days. try estimating price by points. e.g.£45 standard sockets/lights/ switches. £80 cooker/shower points, and see what sort of figure you get. a 5 bed, all made good, should be in the region of £4000
 
If it’s Victorian watch out for ceiling cornices. They will slow you down, damage them and it’s costly.
 
  • Like
Reactions: 1 person

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Re wire time frame
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
8

Advert

Thread statistics

Created
huntos33,
Last reply from
huntos33,
Replies
8
Views
1,419

Advert