Hi all
I've been asked to rewire a shed that has itself been rebuilt, and that previously had power. There is already 4mm SWA cable fed from the main house to it. My question is about the fact that there is a secondary consumer unit already in another outbuilding, approx 10m from the shed. Typically I would have terminated the feed to a smaller CU in the shed, and then had separate circuits for the sockets requested (inside, outside, separately), and one for the lighting.
I am wondering if it is acceptable to put what would be a third consumer unit in for the shed. If no, is there an alternative to this that would allow me to split the SWA for the necessary circuits?
I'm aware that the additional circuits would warrant new calculations for max demand for the whole property and that the client will need to have the installation tested and commissioned by SWIM, but I think the demand will be similar to what was in place before.
Thank you
I've been asked to rewire a shed that has itself been rebuilt, and that previously had power. There is already 4mm SWA cable fed from the main house to it. My question is about the fact that there is a secondary consumer unit already in another outbuilding, approx 10m from the shed. Typically I would have terminated the feed to a smaller CU in the shed, and then had separate circuits for the sockets requested (inside, outside, separately), and one for the lighting.
I am wondering if it is acceptable to put what would be a third consumer unit in for the shed. If no, is there an alternative to this that would allow me to split the SWA for the necessary circuits?
I'm aware that the additional circuits would warrant new calculations for max demand for the whole property and that the client will need to have the installation tested and commissioned by SWIM, but I think the demand will be similar to what was in place before.
Thank you