Dustydazzler
Almost looks like the builder was left to get the DNO cable up inside the meter housing, the smart meter came first and when the DNO came to connect there was no room left to fix the head backI take it when it came to getting the ducting for the DNO supply, a big hammer was the only tool available?
Never seen the cut out mounted like that before either, it certainly doesn't look the most secure mounting. Also never seen the duct left open and not filled with a putty of some sort.
Either way it is pretty rough as ...