Panel board that I have almost finished

uza4usy4.jpg


One of 28 DB' s

y7a8u8up.jpg


One of the 6 fire panels finished

ynezype4.jpg


One massive warehouse

rasaju5e.jpg
Was this in Rugeley by any chance?
 
Very tidy. First class job.

Some minor points (I'd be failing if I didn't think of something):
Lump of crud sitting on top of main switch.
Slight tilt on breakers, particularly towards the RH end.
No space for additional circuits.
 
Very tidy. First class job.

Some minor points (I'd be failing if I didn't think of something):
Lump of crud sitting on top of main switch.
Slight tilt on breakers, particularly towards the RH end.
No space for additional circuits.


Yep well spotted, i assure you it's not there now lol.

I just get given the materials to do the job. I hate MK boards personally.

:smile:
 
Yep well spotted, i assure you it's not there now lol.

I just get given the materials to do the job. I hate MK boards personally.

:smile:

No matter how hard you try you can't help the tilt with the mcb's on these boards when getting a good purchase on the busbar.....the boards are a pile of turd IMHO. Pukka job though, nice and neat with no exposed conductors.
 
back box to the left is for a Rako lightswitch, this is in the garage of a large house
 
Last edited by a moderator:
Consumer unit upgrade I did sub contracting recently. Materials were provided. Took me an hour to straighten my back out after that one. The cupboard was an awkward squeeze to say the least with gas pipes in the way as well.
image.jpgimage.jpg
 
It's the dis board changes that I struggle with most to get neat, the cables are never always long enough! Some properly neat work on here lads, it nice to see people taking pride in their work!
 