B

bigbaddave

Been on a job now for some time, pretty much finished just few spotlights to fit in the main office. Gaffa turns up and says I ain't got you down as having induction. Dave will be back at 1:40 he will do it then... Really I've been on site for weeks and now your saying I need an induction
 
They obviously don't take it seriously, but just need to tick the box for their paperwork. As long as you're getting paid, just humor them. :)
 
Used to do work for a large gas company with depots all over country. Think we worked at 16 sites and had to do 16 inductions following the exact same script and same DVD. The only deviation was where the bogs were on each site. I could have given the induction myself i knew the script that well!!!
 
only induction i ever attended that wasn't just a talk on site rules, was down the salt mine. 2 hours of instruction on how to use the breathing apparatus, follow escape routes , fire drill etc.
 
I had a mate who worked on heathrow airport, Had to have an induction for each section he went through so for one job that was 4x inductions just to change a hand dryer
 
I had a mate who worked on heathrow airport, Had to have an induction for each section he went through so for one job that was 4x inductions just to change a hand dryer

Now that is just plain daft!
It would've been quicker & cheaper just to have someone accompany him.

In my Service 'Engineer' days, I had to have site inductions everywhere, just grin and bare them.
 
I worked on the tyne tunnel 2, and that induction was crazy, they seemed more interested in talking about the budget and each phase of the job than and site rules / safety, 4 hours long it was.
 
When I worked at the shard in london, you had to have a induction for every other floor, bearing in mind it's the tallest sky scraper in Europe it got beyond a joke, especially as I was snagging and up and down like a bloody yoyo!
 
Started on a Bailey's site once, Bomer & Kirkland were involved to (as they always bloody are) had an induction in one room for B&K then had to go into the room next door for a Baileys one. Delivered by the same bloke using the same script. Stupidity at its utmost.
 
What's the point of having a brain in your head if you need to be spoonfed this bloody nonsense on every site you go on?
 
i had been working on a job that has 3 streams (same client and main contractor), one stream high rise and two normal house's. I have had to have 3 seperate induction, 3 seperate id badges, and hand over 3 copies of my public lia, cscs and asbestos awareness, qualifcations and cps registrations. The stupid thing is its at the same office done b y the same person and filed into the same folder. what a waste of time and money.
 
What is the point in having a JIB/CSCS card if you need inducting on every site you go onto?

Every induction is site specific and it's for your own wellbeing and safety. Can't grumble at being paid to watch a DVD for two hour!
 
Inductions are absolutely vital for finding out:
Subsidised canteen facilities.
Smokers area
Which way the traffic goes
How close you can get your vehicle to the job
Do you really need a hot permit to drill a hole
When does the gate get locked and how do you get out.
When do all the lorries arrive, so you can avoid the queues to sign oin

Otherwise a vid of the bleeding obvious
 