E
Engineer54
Yes best practise would always have a flying lead, however if I came accross it on an I&T as long as it had good continuity to fittings would just put it as c3.
Have i understood you correctly here, if an earthed conduit system had a flying lead connection between the earthed conduit and the light fitting you would code it a code 3??
and seen all done in conduit , grabbed megger done Zs would you believe it a efli reading that was within the max allowed in reg book.
oliceman: