Im starting fresh electrical work on a new build. The mains is coming on the ground floor, from there I need to wire 3 more CU. What's the best way to go about it? So altogether there'll be a CU on each floor. Ground floor, first, second and third. 4 CU's altogether. What do you guys reckon?
 
I've done a 5-bed with 3-phase and approx. 40 circuits.

Admittedly somewhat high-spec. E.g. kitchen had circuits for 3 ovens & hob, as well as sockets & lights. And 2 backup immersion tanks in case of boiler failure. Plus various outside lighting & gate circuits.

Again, sockets in 2.5mm, multiple circuits per floor to keep the cable lengths down.

In this case, everything in a basement plant room, rather than boards scattered about the building. Doesn't make much difference to cable lengths.
 
.

dogesub.jpg
 
Ha, talk about houses, i am working on one atm, its rather large and difficult to cable. Plant room has TP DB which is main DB, garage has submain TP DB, 1st floor has submain TP DB, with two further sub mains with SP DB's which feed local ccts on ground floor and 1st floor.
Thats 3X TP DB and 2X SP DB , have not counted ccts yet but 100M of 2.5T&E disappears in one bedroom alone, lol. Local ccts are to ensure VD and ELI will be met.
 
This is turning into a Facebook page now loads of random pictures and s***t to scroll through. Just the same a posting American video's that have no relevance to the thread/posts or electrical installation in this country. Can we try to keep on the post ( well most of the time anyway)?
 
Ha, talk about houses, i am working on one atm, its rather large and difficult to cable. Plant room has TP DB which is main DB, garage has submain TP DB, 1st floor has submain TP DB, with two further sub mains with SP DB's which feed local ccts on ground floor and 1st floor.
Thats 3X TP DB and 2X SP DB , have not counted ccts yet but 100M of 2.5T&E disappears in one bedroom alone, lol. Local ccts are to ensure VD and ELI will be met.
The hardest thing is trying to find an accessible cupboard to house them in.
 
Sometimes the odd pic is funny, sometimes it's just makes no sense and is a little strange, but if I'm honest it doesn't really aggravate me.

I do get a bit aggravated by some of the posts I see on this forum, advise and discussion is fine (different opinions and prospective are good) but asking what size cable to use makes a mockery of mine and everyone elses here training.
I enjoy the forums but I get a little annoyed when I feel people are taking advantage, It's basic stuff and if you don't know it you shouldn't be taking on these jobs.
 

Reply to Sub Board?? How shall I go about it? in the UK Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock