FatAlan

~
Trainee
Attached picture shows suppliers cut out, meter and isolator. I need to split the tails after the isolator and install a switched fuse to a 16mm SWA going out to an out building. Any suggestions or pointers on suitable compact switch fuse units bearing in mind I've also got to fit in some henley blocks?
IMG_5158.jpg
 
Can't see all that fitting in there. Fit another cabinet to house the switch-fuse so you only need the service terminal blocks in the existing one.
 
To fit another supply. Out of the switch into the blocks, reconnect existing supply then out of blocks to new supply.
 
move existing isolator up. a bit of bending of meter tails, fit 80A KMF and henleys below isolator. bit of angle steel gland plate for SWA. tight but doable.
 
move existing isolator up. a bit of bending of meter tails, fit 80A KMF and henleys below isolator. bit of angle steel gland plate for SWA. tight but doable.
That’s what I’m considering Tel although don’t like the idea of manipulating the switch without pulling the main fuse :rolleyes:
 
That’s what I’m considering Tel although don’t like the idea of manipulating the switch without pulling the main fuse :rolleyes:
VDE Crowbar?
 

OFFICIAL SPONSORS

Back
Top